Final Alignment and the Handover Check
Before the crew loads the truck there is a short window in which every defect costs nothing to fix. The handover list at Metal Gate Installation Mount Pleasant, SC highlandahs is written to be walked through on site, since a Mount Pleasant metal gate installation signed off from the driveway looks fine from twenty feet and is only measurable up close.
Geometry
Put a level on both posts in both directions. Measure the leaf diagonals and confirm they match. Check that the gap at the latch is even from top to bottom and that the ground clearance holds through the whole swing rather than only at the closed position. Any of those being out is a ten minute adjustment now.
Operation by Hand
With the operator disengaged, move the gate slowly through its full travel. It should be even in effort, stay where it is left, and close onto the catch without being lifted. Heaviness at one point or a leaf that drifts is a hinge or an alignment issue that will only get worse.
Automation
Watch a full cycle in each direction. Confirm the limits stop the gate short of any physical stop, that the force setting is at the lowest value that works reliably, and that the auto close timing suits how the entrance is actually used. Then trigger each photo eye and each safety edge by hand and watch the gate reverse.
Finish and Made Good
Inspect every field cut, every drilled hole and every weld made on site for a proper coating repair. Bare metal left on a coastal installation starts rusting within weeks. Check the footings are crowned so water sheds away from the post rather than pooling against it.
Access Control
Programme and test every transmitter, the keypad and any intercom, and remove any temporary installer code. Confirm the manual release works and operate it yourself rather than watching somebody demonstrate it.
What to Take Away
The operator model and serial number, the powder coat colour reference, the leaf weight, the footing dimensions, the conduit route photographs, the hinge type and the warranty terms. That record is what makes every future service cheap, and it takes five minutes to collect on the day and hours to reconstruct later.